Huber Ridge Area

Construction on SR 3 @ Paris

Posted in: Huber Ridge Area
Southbound Westerville Road at Paris Boulevard is restricted to one lane. Crews are making repairs to phone lines and expect to be completed by the end of May, weather permitting. (AT&T)
  • Avatar
  • bambi
  • Respected Neighbor
  • Blendon Township, OH
  • 337 Posts
Thanks

Thanks for the information. I have been wondering what was going on and how long it would be like that.
Logo_w158
Blendon Township, Ohio 43081